KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  9-6-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Begin Turtle Deck

Started on the turtle deck.

- Laid out, drilled, deburred and installed the 6 (3 on each side) brackets onto the splice channel.

- Put the right skin on top of the channel, aligned with the edge of the channel per the plans, and clamped in several places down the spine.

- Drilled about 15 to 20 pilot holes down the length of the skin/channel, making sure to always align the skin with the edge of the channel flange before drilling. If your channel had a bow in it, that now comes out as you align the skin with the channel flange.

- Put the left skin on top of the right, and cleco'd thru both skins and into the pilot holes.

- Then went back and drilled the remainder of the pilot holes thru all 3 pieces.

- Took everything apart and deburred.

- Put it all back together and riveted in place.

- Laid the entire assembly on top of the tailcone box, but without a second set of hands I did not want to try to put it in place.
' style=

Clip angles have been riveted onto the channel, along with pilot holes into the channel.

Clip angles have been riveted onto the channel, along with pilot holes into the channel.

' style=

Updrilled, and just prior to riveting.

Updrilled, and just prior to riveting.

' style=

Layed on top of the tailcone box, ready to be test fit.

Layed on top of the tailcone box, ready to be test fit.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.