Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Fuselage
9-3-2011
< Previous Log Entry
Next Log Entry >
Date:
9-3-2011
Number of Hours:
0.00
Manual Reference:
Brief Description:
17 Aft tailcone assembly
- After riveting everything at the back of the tailcone I riveted all the cross ties to the vertical bulkheads.
- Be sure to leave out the rivets that will be needed for the turtle deck formers later on.
The inside of the tailcone, viewed from above.
The seatbelt attach bracket & cross-ties riveted in place.Note the un-riveted holes for later parts.
The lower cross ties riveted in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Sonex Standard Gear Home
Category
# Logs
# Hours
All
1608
2445
Aluminum Materials
45
98
Angle Parts
63
126
Avionics
96
132
Bending Brake
10
15
Canopy
61
91
Controls
55
85
Cowl
84
99
Empennage
100
179
Engine
224
233
Finish-Polish
66
85
FLIGHT!
18
Fuel System
36
43
Fuselage
208
382
Hardware
3
4
Landing Gear
74
95
Learning Point
2
1
Miscellaneous
84
111
None
7
Prop
6
7
Smoke System
7
6
Tools
5
9
Upholstery
7
6
Wings
347
638
Copyright © 2001-2024 Matronics. All Rights Reserved.