Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Fuselage
6-28-2011
< Previous Log Entry
Next Log Entry >
Date:
6-28-2011
Number of Hours:
1.25
Manual Reference:
Brief Description:
AFT FUSELAGE construction
- Finished aligning, drilling and cleco'ing the upper longeron
- Aligned, drilled and cleco'd the lower longeron
Upper longeron cleco'd. Lower longeron in place for drilling.
Lower longeron in place with double sided tape + duct tape
Top and bottom longerons drilled and cleco'd
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.