KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  6-27-2011
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Begin AFT FUSELAGE construction!

Tonight I finally got to begin on the aft fuselage construction!

- Spent a lot of time looking over and trying to understand the next 4 sheets of drawings.

- Marked the right fuselage skin for a 3/4" bend along the forward vertical edge, then measured and marked the location of the vertical framing members.

- Bent the forward edge as req (14 deg).

- Put double sided tape on the upper longeron, alinged it with the top of the skin, and set the longeron.

- Carefully turned over the skin and drilled 4 pilot holes for the longeron. Cleco'd in place then called it a night.
' style=

3/4

3/4" bend required at front edge of aft fuselage side skin

' style=

1st longeron (upper) being drilled and cleco'd

1st longeron (upper) being drilled and cleco'd

' style=

Top longeron cleco'd

Top longeron cleco'd

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.