Michaels Web Site
Sonex Standard Gear
Wings
7-6-2010
< Previous Log Entry
Next Log Entry >
Date:
7-6-2010
Number of Hours:
2.00
Manual Reference:
Brief Description:
More rivets...
Got back from a long weekend and pounded some rivets for a while.
Got all the non-flush rivets set, except for the tip web. After the tip, it's onto dimpling (in place) and setting the flush rivets.
I only have 2 rivets on this spar that I want to drill out and redo.
About 17 hours into the assembly of spar #2.
A bad rivet I'll have to drill out.
The root area with all the non-flush rivets set.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.