Laid out and drilled for most of the angles. I still have W20-02 and -03 to do.
Overall, the second spar was certainly faster than the first. But that's just about always true of two (nearly) identical assemblies.
I also added another 2-lamp 48" fluorescent fixture above the work table, earlier today. I had only one along the table centerline. Now I have 2 on a diagonal to more evenly light the whole table.
All the angles that were laid out and drilled tonight
I added another 2-lamp 48" fluorescent fixture above the work table