KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  6-19-2016
Number of Hours:  0.00
Manual Reference:  
Brief Description:  New Canopy (1 of 2)

Spent 4 hours at the airport locating and drilling all the holes for the rivets along the horizontal side rails.

Also fixed the alignment pin which fell out several months ago. Made a small solid block of aluminum that slid down the inside of the horizontal rail. Before installing I drilled and tapped the piece to accept the alignment pin.

Then brought the canopy home to do all the finish work and upsize the rivet holes (to allow for expansion).
' style=

Clecos during riveting

Clecos during riveting

' style=

Slide area

Slide area

' style=

Plastic spacers

Plastic spacers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.