KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  5-1-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Flap fairings

- First installed a new cable from the ELT remote switch to the ELT.

- Made the L and R flap fairings. These get installed after the flaps are dialed in during flight testing. They serve to visually cover the gap between the flaps and the fuselage sides, but they also act as stops, so the flaps can't push up past neutral with wind loading.
' style=

2 polished flap fairings (R & L)

2 polished flap fairings (R & L)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.