KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  6-5-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Wiring...

- Ran some wire bundles through the recently installed Click Bond supports.

- Also used one Click Bond to support the static and pitot tubes, and the fuel sight guage tubing.

- Made one end of the shielded P-Lead wires and attached them to the panel switch. Cut both to length on the engine-side of the firewall.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.