KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  5-7-2013
Number of Hours:  2.25
Manual Reference:  
Brief Description:  RDAC, Magnetometer, Connectors

- Continued making a waterproof box for the RDAC. I needed more height, so I used the RDAC again as a mold to create another 1" high box. This one will get placed on top of the previos one, and fiberglassed together.

- Also had to make adjustments to the magnetometer shelf to accommodate the brass screws and nuts.

- Made some end connectors and labels for the Oil Temp and Oil Pressure wires.
' style=

New fiberglass box being formed.

New fiberglass box being formed.

' style=

Previous box at left, new box curing at right.

Previous box at left, new box curing at right.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.