Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
5-4-2013
< Previous Log Entry
Next Log Entry >
Date:
5-4-2013
Number of Hours:
2.75
Manual Reference:
Brief Description:
Wiring + panel install
- Made most of the rest of the ground wires for the panel.
- Added fast-on tabs to nearly all wires,
- Attached wires to all the switches on the pilot-side panel section. Looped the wires with tape to keep them bundled temporarily.
- Installed the left panel and got most of the rivets in.
- Also repainted the center panel section with crinkle paint (the first try didn't work well). I'll see how it looks in the morning.
Left panel section ready to be installed.
Left panel section with all the other spaghetti!!
Left panel in place and partially riveted. Radio goes in the large hole.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Sonex Standard Gear Home
Category
# Logs
# Hours
All
1608
2445
Aluminum Materials
45
98
Angle Parts
63
126
Avionics
96
132
Bending Brake
10
15
Canopy
61
91
Controls
55
85
Cowl
84
99
Empennage
100
179
Engine
224
233
Finish-Polish
66
85
FLIGHT!
18
Fuel System
36
43
Fuselage
208
382
Hardware
3
4
Landing Gear
74
95
Learning Point
2
1
Miscellaneous
84
111
None
7
Prop
6
7
Smoke System
7
6
Tools
5
9
Upholstery
7
6
Wings
347
638
Copyright © 2001-2024 Matronics. All Rights Reserved.