KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  4-2-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finalize baffle layout

- Did a bunch more fitting, poking and prodding of the baffles. Duct taped everything together. Will locate rivet holes tomorrow.

- Located where wires and things will penetrate the baffles, and marke them for cutting.

- In photo #2 I'm holding up a 2" dia SCAT tube, to show where it will be located on the rear baffle. This is so pressurized air moves the hot air for the cabin heater when it's engaged.

- In photo #3 this is where I'm thinking of locating the oil breather overflow; on the outside face of the left valve cover. The string represents the rough path of the breather tube. I put the top cowl on and the bottle fits there. When tipped down the oil can flow downhill and back into the valve cover. I've never seen anyone do this, but it looks promising to me.


HIT 1,900 HOURS TONIGHT! Either I take a long time, or I'm counting time that others don't count. ' Cause even scratch builders don't usually take this many hours to build.
' style=

All baffles (except oil cooler) laid out.

All baffles (except oil cooler) laid out.

' style=

Air to pressurize heater box will go here.

Air to pressurize heater box will go here.

' style=

Idea for locating oil breather catch. String is rough path of breather tube.

Idea for locating oil breather catch. String is rough path of breather tube.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.