KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  2-2-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Wiring + AeroInjector

After hanging the engine today I began the tasks to complete the engine installation.

- Finished up some wiring that had been waiting for the engine, so I could measure the wire lengths.

- Temporarily installed the left side of the panel, and sat in the cockpit for a while. Everything looks like is lays out fine except for where I proposed to put the mixture control. It would be too difficult to get to where I had it. So I'll look at moving it, or using the mixture mount that comes with the throttle quadrant>

-Temporarily installed the AeroInjector (carb) so that I can figure the routing and lengths of the throttle and mixture cables.
' style=

Finishing up some of the wiring and labeling

Finishing up some of the wiring and labeling

' style=

Put in part of the panel temporarily to see how everthing lays out.

Put in part of the panel temporarily to see how everthing lays out.

' style=

Temporarily put the AeroInjector in place so I can figure out the throttle/mixture cables.

Temporarily put the AeroInjector in place so I can figure out the throttle/mixture cables.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.