KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  3-17-2012
Number of Hours:  0.00
Manual Reference:  several
Brief Description:  Paint, weights, panel, fuel...

More miscellaneous stuff...

- Continued working on the fuel filler overflow pan. Drilled and counter sunk a hole in the "pan" for the drain tube. Drilled a hole in the side of the fuel filler box to run the drain tube out (photo #1).

- Took apart and cleaned all the parts that make up my removeable instrument panel (photo #2).

- Drilled the 5/8" hole in the upper right side of the instrument panel, for the fuel sight guage (photo #3).
' style=

Overflow

Overflow "pan" resting above; hole in filler box side, below.

' style=

Instrument panel parts getting ready for paint.

Instrument panel parts getting ready for paint.

' style=

Hole in instrument panel for upper end of site guage.

Hole in instrument panel for upper end of site guage.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.