Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
11-11-2011
< Previous Log Entry
Next Log Entry >
Date:
11-11-2011
Number of Hours:
1.50
Manual Reference:
F11
Brief Description:
Updrilling forward fuselage
- Fitted the upper firewall to the lower firewall.
- Began updrilling everything. Got about 4/5 of the forward fuselage done.
Upper and lower firewalls finally joined!
Updrilling underneath
Updrilling through and around the spar tunnel
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.