Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
6-3-2011
< Previous Log Entry
Next Log Entry >
Date:
6-3-2011
Number of Hours:
2.75
Manual Reference:
Brief Description:
LEFT aileron construction
- Got the last rib located and pilot drilled, then updrilled all the holes.
- Pre-drilled small pilot holes in the hinge, set the hinge as I did for the right aileron, then
- Started drilling the hinge into the aileron. Got a half dozen holes set.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.