Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
5-30-2011
< Previous Log Entry
Next Log Entry >
Date:
5-30-2011
Number of Hours:
2.25
Manual Reference:
Brief Description:
LEFT aileron construction
Began work on the LEFT aileron.
- Layed out all the cuts (mirror image of right aileron)
- Used the shears and the Dremel cut-off wheel to make all the cuts
- Filed and sanded the cut edges
- Layed out all the hole locations on the skin
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.