Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
12-1-2010
< Previous Log Entry
Next Log Entry >
Date:
12-1-2010
Number of Hours:
1.00
Manual Reference:
Brief Description:
(4) W18-02 inspection covers
- Finished the (4) W18-02 inspection covers
- Spent the rest of the time planning the next parts and assemblies to make, based on aluminum on hand. Looks like I'll be making the rudder, next. That will be good, so I can actually say the vertical tail assembly is done.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.