Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
All
8-20-2010
< Previous Log Entry
Next Log Entry >
Date:
8-20-2010
Number of Hours:
1.50
Manual Reference:
Brief Description:
All nose ribs done; bending main ribs
Finished flanging the lightening holes in the final 4 nose ribs, so all nose ribs are done.
Bent over the flanges of 2 main ribs, and put a 3rd in the blocks.
750 hours on the project so far.
Main rib blank between form blocks.
The other side.
4 last nose ribs done, 2 man ribs bent, 1 main rib in blocks.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.