Installed the cone ends in the pushrods with the specified pulled rivets, then prime painted the ends since they got a little scuffed up during construction.
Last, I measured and cut the shorter, thinner pushrods, dressed the ends, and sloshed the insides with prime paint.
After everything cures I can put on the jamb nuts and the rod-end bearings.
Long pushrods done.
Pushrod ends complete.
Short pushrods after injecting prime paint inside.