With everything cleco'd, match drilled all the skins to the spar.
Then drilled all the holes from the leading edge of the nose, into the counterbalance (steel pipe). Super slow speed on the drill, and pressure, gets the job done.
Long #30 drill bit to get to the tab at the aileron counterbalance
Clecos in the nose are at the holes drilled in the counterbalance