Powered By Kitlog Pro v2.0
Michaels Web Site
RV-7
All
5-22-2023
< Previous Log Entry
Next Log Entry >
Date:
5-22-2023
Number of Hours:
2.25
Manual Reference:
Brief Description:
RIGHT tank plumbing (1 of 3)
Did much of the plumbing for the right tank.
Here I again used coat hangar wire to get the correct bends. I used a spar float to stick the wire through, since that's the kind of float I have in this tank. See photos on this and the next page.
Extra float, with coat hangar wire - Full Down
Full up
Actual float and wire - Full Down
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
451
697
7 Electrical
3
4
7 Empenage
140
195
7 Finish Kit
1
7 General
3
7 Tools
3
4
7 Wing
300
494
7-Misc Parts
1
Sonex Standard Gear Home
Copyright © 2001-2024 Matronics. All Rights Reserved.