KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  3-25-2023
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Right wing prep + fuel system parts (1 of 3)

Big Saturday of work today. 3 pages of photos.

1. Cleco'd and match drilled the fuel filler assembly & drain port.
2. Countersunk the holes in the fuel filler assembly.
3. Constructed the access plate in the root rib.
4. Rough cut the aluminum vent line, and made sure it ran through the ribs.
5. Deburred all the holes in the fuel tank skin.

Still need to debur all the ribs. Then I can start dimpling everything!
' style=

Fuel filler assembly from the exterior...

Fuel filler assembly from the exterior...

' style=

And the interior...

And the interior...

' style=

Fuel drain port fitting.

Fuel drain port fitting.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.