Powered By Kitlog Pro v2.0
Michaels Web Site
RV-7
All
10-25-2022
< Previous Log Entry
Next Log Entry >
Date:
10-25-2022
Number of Hours:
2.00
Manual Reference:
Brief Description:
Fiberglass rudder base
Cut and fitted the fiberglass bottom of the rudder. I cut just outside the faint lines molded into the piece, then filed away material until it fit.
Getting the trailing edges to align (photo #2) was key.
Marked for the rivet holes (photo #3). I'll drill them tomorrow.
This fiberglass piece does not get riveted on until later, as the instructions say some trimming may be necessary to clear the tailwheel spring.
Cut and fitted
The trailing edges of the fiberglass (right) & rudder (left) align.
Marking for the rivet holes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
449
696
7 Electrical
3
4
7 Empenage
140
195
7 General
3
7 Tools
3
4
7 Wing
299
493
7-Misc Parts
1
Sonex Standard Gear Home
Copyright © 2001-2024 Matronics. All Rights Reserved.