KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE
' style=
Date:  2-22-2008
Number of Hours:  1.00
Manual Reference:  Vertical Stab
Brief Description:  Cleco'd the VS skin, and match drilled.

Continued with the VS. Things were going quickly so I continued and finished by match drilling the skin to the VS structure.
' style=

VS skin cleco'd in place.

VS skin cleco'd in place.

' style=

Another shot of the VS before match drilling.

Another shot of the VS before match drilling.

' style=

Using a reamer instead of drill to match drill the VS skin to the sub structure.

Using a reamer instead of drill to match drill the VS skin to the sub structure.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.