Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-8
All
1-19-2008
< Previous Log Entry
Next Log Entry >
Date:
1-19-2008
Number of Hours:
2.00
Manual Reference:
Front Spar Assy.
Brief Description:
Began the front spar assembly work.
Made some decent progress with the front spar. Match drilled, bent to 6 degrees, and re-assembled to check the fit before moving on.
Cleco HS-702 to HS-810-1 and HS-814-1 then match drill per the plans
Bend the tabs of HS-810-1 and HS-814-1 to 6 degrees after radiusing the ends to 1/4"
After bending to 6 degrees.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
63
75
Empennage
56
75
Practice kit
3
Runway
1
Shop Supplies
1
Tools
2
Copyright © 2001-2024 Matronics. All Rights Reserved.