Date:
10-5-2019
Number of Hours:
2.00
Manual Reference:
WXB-T06
Brief Description:
Hinge Drilling
INcorrectly drilled location of elevator. Off by about 1/8. Hinge is salvageabl but elevator is not.
Ordered new elevator stock folded sheet - 48"