KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE
' style=
Date:  6-25-2019
Number of Hours:  6.00
Manual Reference:  L .elevator
Brief Description:  Starting L.elevator construction

Stiffeners were all completed for the L. elevator at the same time i was doing the R.side. So, i assembled, match drilled, de-burred and dimpled all the L counter weight arm components. Assembled the counterweight arm, E902 spar, root rib, and E915 elevator spar to the skin.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.