Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
12-4-2019
< Previous Log Entry
Next Log Entry >
Date:
12-4-2019
Number of Hours:
1.50
Manual Reference:
Brief Description:
Elevator counterweights
Trimmed all conterweights as per the plans and installed. Installed and torqued the mounting bolts to specs. As stated in the plans, both sides are heavy at this point, and will get there final adjustment after painting.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
117
488
Empennage
71
282
Tech Support
1
1
Tools
5
25
Wings
40
180
Copyright © 2001-2020 Matronics. All Rights Reserved.