Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
12-4-2019
< Previous Log Entry
Next Log Entry >
Date:
12-4-2019
Number of Hours:
1.50
Manual Reference:
Brief Description:
Elevator counterweights
Trimmed all conterweights as per the plans and installed. Installed and torqued the mounting bolts to specs. As stated in the plans, both sides are heavy at this point, and will get there final adjustment after painting.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.