KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  5-31-2014
Number of Hours:  4.00
Manual Reference:  46-08
Brief Description:  Assembled Drip Trays

Countersunk one hole in each of the FF-01226C Drip Tray Stiffeners and the corresponding holes in the Drip Trays and squeezed flush rivets. I misread the instructions and assumed flush rivets were needed to attach the stiffeners to the trays. So, I countersunk all the outside holes and used AN426 AD3-4 rivets. I wasted over 30 minutes doing this but the drip trays will look nicer. Attached the FF-01226D Doublers to the trays using fuel tank sealant. Sealed the holes in the drip tray corners with sealant.
' style=

Rivet shop head flush in hole

Rivet shop head flush in hole

' style=

Assembled Drip Trays

Assembled Drip Trays

' style=

Drip tray corner holes sealed

Drip tray corner holes sealed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.