KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  2-19-2018
Number of Hours:  0.50
Manual Reference:  36A
Brief Description:  Work on nose gear leg fairing

Final-drilled #19 the screw holes at the side of the nose gear leg assembly fairing. Riveted the piano hinges to the nose gear leg fairing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.