KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  6-18-2016
Number of Hours:  4.00
Manual Reference:  POH, 34
Brief Description:  Reviewed Pre-start procedure, Canopy Fairing work

POH-ii (7-4): Reviewed the pre-start procedure to see the EMS display. Turned the Fuel Selector and Master Switch ON. The fuel pressure went up to 1.8 PSA only (low) but I only have about 2 galllons of fuel in the tank.

34-15: Spent most of the workday sanding the Canopy Fairing and there is still a lot of sanding to do.

Checked for fuel leaks and none found. Removed the blue vinyl film from underneath the wings.
' style=

Sanding Canopy Fairing

Sanding Canopy Fairing

' style=

Canopy Fairing  is still rough

Canopy Fairing is still rough

' style=

Fairing looks nicer after sanding

Fairing looks nicer after sanding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.