KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-27-2013
Number of Hours:  4.50
Manual Reference:  SB-12-11-09
Brief Description:  Landing gear modification

Match-drilled holes in the right Fuselage skins through the side skin doublers. Match-drilled holes into the F-1202U-B Angle through the F-1204 Center Section Assembly. Deburred the drilled holes in the fuselage and angles.
' style=

Right side skin doublers

Right side skin doublers

' style=

Match-drilled left stiffener angle

Match-drilled left stiffener angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.