KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  10-3-2012
Number of Hours:  1.00
Manual Reference:  29-06
Brief Description:  Drilled holes in the the Map Box Door and hinge

Drilled 1/8 holes in the other Door Hinge Half and then match-drilled holes in the Map Box Door. Painted the Tunnel Pocket and Pocket Base with a hammered silver finish.
' style=

Map Box Door & hinge w/ holes

Map Box Door & hinge w/ holes

' style=

Painted Tunnel Pocket

Painted Tunnel Pocket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.