KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  11-22-2011
Number of Hours:  0.50
Manual Reference:  31-13 & -15
Brief Description:  Prepped wireway and ELT brackets

Trimmed the flanges of the F-12125 Over Rudder Wireway, Deburred it and the F-12125C Wireway Bracket and the F-12122 Artex ELT Bracket.
' style=

Prepped brackets

Prepped brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.