KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-28-2011
Number of Hours:  0.50
Manual Reference:  30
Brief Description:  Finishing Kit arrives

Moved the workbench towards the side of the garage( leaving only about 6 inches between it and the storage shelves) to make space for the Finishing Kit crate which arrived today. It was delivered by J.B. Schenker and the driver left a large steel and standard wood crates which were separate from the big box where the aircraft parts were. I was not home and the driver insisted to my wife that they were part of the delivery and he did not want to take them with him. The Finishing Kit crate is huge and with it in the garage I don't much space left, I'll have to figure out a way to do work with the very limited space left in the garage. Of course, I will also have to get rid of the wooden and steel crates.
' style=

Finishing Kit crate

Finishing Kit crate

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.