KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  2-21-2011
Number of Hours:  3.00
Manual Reference:  23-04
Brief Description:  Primed Arm Rests, Bulkhead Side Channels, etc

Separated the F-1202L Gussets and deburred the edges. Primed the F-1203H Arm Rest Brackets, the F-1202E and F-1203G Bulkhead Side Channels, the F-1248 Arm Rests, F1202L Gussets and F-1248B Fuselage Pin Latches. I decided to coat the inside parts with Rust-Oleum hammered finish (7213 Silver). I had tested it before on a scrap piece and it is more durable compared to other coatings I had tried, all spray cans. My spraying was uneven but acceptable, I think. Where it was sprayed evenly, it looked really nice. I need to do more practice spraying it to get better result next time.
' style=

Trial fit of parts on the right side

Trial fit of parts on the right side

' style=

Arm Rests w/ hammered finish

Arm Rests w/ hammered finish

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.