KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-1-2011
Number of Hours:  2.00
Manual Reference:  22-02
Brief Description:  Prepped Fwd Lower Fuselage parts

Primed the F-1207B Baggage Bulkhead. Dimpled 2 holes in the F-1201C Firewall Bottom. Countersunk the nutplate attach holes in the sloped flanges of the F-1217A-L&R Tunnel Ribs and the the F-1272 Fwd Fuse Skin. Trimmed the excess material from the F-1288 Cooler Stiffener. Deburred the edges of the Tunnel Ribs, Cooler Stiffener and the Fwd Fuse Skin.
' style=

Primed Baggage Bulkhead

Primed Baggage Bulkhead

' style=

Trimmed Cooler Stiffener

Trimmed Cooler Stiffener

' style=

Tunnel Rib holes countersunk

Tunnel Rib holes countersunk

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.