KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  10-21-2010
Number of Hours:  1.50
Manual Reference:  20-02&-03
Brief Description:  Match-drilling of Center Section

Installed the F-1204R Retainer Block on the Center Section. Clamped the F-1204D Center Section Aft Bulkhead to the Center Section Assembly and then clecoed the F-1276 Bottom to the assemblies. Started match-drilling #30 holes in the center section. My hand got tired after drilling a few holes. It takes time to drill a hole into the thick piece of aluminum. It is not as hard as drilling the steel aileron counterbalance but still it is not easy. Another 68 holes to match-drill. Primed the F-1204T Skin Stiffeners, F-1204P Skin Attach Flanges and the F-1204CL-R Fwd Bulkhead Side Assembly.
' style=

Primed parts

Primed parts

' style=

Center Bulkhead & Assembly

Center Bulkhead & Assembly

' style=

FMatch-drilled holes clecoed

FMatch-drilled holes clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.