KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  4-18-2010
Number of Hours:  5.00
Manual Reference:  17-02 & 40-05
Brief Description:  Priming, Lighting System Wiring and Riveting

Primed the left 3 bottom wing skins. Made 2 WH-B212 Nav/Strobe Power Wires, a WH-B213 Pulse Power Wire and WH-B214 Landing Light Power Wire per plans. Removed the Left Terminal Bracket and installed the Nav/Strobe Power Wire and routed through the snap bushings to the most outboard Nose Rib. Riveted most of the bottom of the Inbd Wing Skin. Had to stop riveting around 9 PM to be a good neighbor.
' style=

Wiring to Terminal Bracket

Wiring to Terminal Bracket

' style=

Partly riveted Bottom Skin (aft)

Partly riveted Bottom Skin (aft)

' style=

Front of Inbd BottomSkn

Front of Inbd BottomSkn

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.