KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  3-28-2010
Number of Hours:  7.00
Manual Reference:  15-03
Brief Description:  Fluting, deburring and priming of Main Ribs.

Fluted the Main Ribs and deburred them. Spent most of today's work deburring using files, the Scotchbrite wheel, Dremel-like grinder and Scotchbrite pads. The pads don't last long sanding the ribs. Also spent a lot of time priming. It was windy today and those that I primed in the driveway didn't look nice. I ended up priming a few at a time inside the garage (with the door closed). As soon I finished spraying, I would open the door to vent the odor. Hopefully, I could do some assembly tomorrow (something fun).
' style=

Fluting Main Ribs

Fluting Main Ribs

' style=

Priming Ribs

Priming Ribs

' style=

Deburring

Deburring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.