Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Empennage
10-9-2009
< Previous Log Entry
Next Log Entry >
Date:
10-9-2009
Number of Hours:
1.50
Manual Reference:
10-09
Brief Description:
Temporary Attachment ofUpper Skins.
Clecoed the Upper Skins (F1279) to the Tailcone Assembly to check the fit. It was good. Removed the Skins and will prime them tomorrow. Removed the vinyl film from the inside and the outside mating surface.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.