Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Empennage
7-25-2009
< Previous Log Entry
Next Log Entry >
Date:
7-25-2009
Number of Hours:
5.00
Manual Reference:
09-03
Brief Description:
Spar Box assembly.
Primed HS-1211 Spar Caps, HS-1209 Spar Cap Spacers and HS-1212 Inspar Ribs and riveted per Step 2. Spar Box Assembly clecoed together. WD-1207 Upper Horn and WD-1208 Lower Horn final drilled. Final drilled WD-1222 Counterbalance brackets. WD-1223 Counterbalance Arm inserted in Spar Box Assembly and holes match-drilled. Step 10 (Counterbalance Arms and Brackets rotated 90 degrees) accomplished.
Assembled Spar Box.
Final drilling CB brackets.
CB Arm and Brackets rotated 90 degrees.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.