KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  2-17-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Repositioned H-Stab

I need more work space to work on the Wings when they arrive. The Tailcone had been placed on top of 2 shelving units before. The H-Stab is on the workbench and needs to be relocated so I can use the workbench. After some thinking and planning I was able to hung it above the garage door. I wrapped nylon straps around one end and hung it using a hook onto a chain running across the steel angles that hold the garage door frame and opener. The other end sits on scrap plywood supported by steel angles anchored to the ceiling. It's not pretty but it works.
' style=

H-Stab hanging from the ceiling

H-Stab hanging from the ceiling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.