KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  12-17-2017
Number of Hours:  2.00
Manual Reference:  N 16-10-17
Brief Description:  Install Reiff Preheat System

Started work on installing the Reiff Preheat System. Drilled two 3/16 holes in the F-1201E-R Oil Tank Bracket. Installed the Hotband Heater around the oil tank and safety-wired the screw. Cleaned the areas where the Hotstrip Heater and thermostat will be placed. Applied epoxy on the heater strip and thermostat and placed them at the base of #1 cylinder and bottom of the oil tank, respectively.

Removed the paint around the hole in the F-12016-1 bracket where the ground terminal will be placed. Crimped an ES-36154 Ring Terminal to the green ground wire. Will wait for the epoxy to cure before connecting the wires and tie wrapping them.
' style=

Hotband heater on oil tank

Hotband heater on oil tank

' style=

Thermostat on oil tank

Thermostat on oil tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.