Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
All
8-13-2009
< Previous Log Entry
Next Log Entry >
Date:
8-13-2009
Number of Hours:
2.50
Manual Reference:
09-08, 09-09
Brief Description:
Riveting of Main Skin and Hinges.
Riveted the top skins (HS-1201) to the Stabilator Skeleton Assembly (SSA), the remaining holes in the SSA and the Aft Hinges.
Top skins completely riveted.
Holes in Assembly riveted.
Hinges riveted to aft Main Skins.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.