KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  7-25-2009
Number of Hours:  5.00
Manual Reference:  09-03
Brief Description:  Spar Box assembly.

Primed HS-1211 Spar Caps, HS-1209 Spar Cap Spacers and HS-1212 Inspar Ribs and riveted per Step 2. Spar Box Assembly clecoed together. WD-1207 Upper Horn and WD-1208 Lower Horn final drilled. Final drilled WD-1222 Counterbalance brackets. WD-1223 Counterbalance Arm inserted in Spar Box Assembly and holes match-drilled. Step 10 (Counterbalance Arms and Brackets rotated 90 degrees) accomplished.
' style=

Assembled Spar Box.

Assembled Spar Box.

' style=

Final drilling CB brackets.

Final drilling CB brackets.

' style=

CB Arm and Brackets rotated 90 degrees.

CB Arm and Brackets rotated 90 degrees.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.