KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  5-4-2013
Number of Hours:  5.00
Manual Reference:  SB13-04-05, 42D-19
Brief Description:  Oil tank mount bracket SB and wiring

Drilled holes into the F-1201E left and right Oil Tank Side Brackets and then match-drilled holes into the F-1201G-MOD-Rib. Deburred the drilled holes as well as the edges of the rib. Will prime and paint the rib later and then rivet in place.

Connected the WH-00036 Tunnel Conversion to the WH-RV 12 Tunnel Harness and the WH-00026 Option Conversion Harness to the WH-RV-12 Optional. The loctite seems to dry fast and I broke one of the thumb screws while tightening it. Cut the WH-L435 and he WH-L436 wires and put heat shrink tubing to the cut ends. Routed the several long wires from the WH-00026 and WH-00036 harnesses and routed under the Panel Base and through the F-1202F and F-1203A Bulkheads.

Section 42D-20, Step 5 is confusing and difficult to understand. I have a WH-00026 Fix-1 harness butI don't know where it goes. I can't proceed until I figure this thing out.

Installed a new cotter pin to the left landing gear axle nut to replace the one that broke last month.
' style=

MOD Rib match-drilled

MOD Rib match-drilled

' style=

Harnesses connected

Harnesses connected

' style=

Harness wires in tunnel

Harness wires in tunnel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.