Today I was able to rivet all of the stiffeners to the right elevator skin. I had some issues with rivet lengths and bending them over but got that solved by borrowing some 3 - 3's from Gerry. The 3.5's were too long as called out on the plans. The 3's met the rivet gauge spec right on both prior to back riveting and after. The height and diameter of the shop heads are right on spec and turned out good.
I have more time to work this week because I am off of work. I switched jobs and have a down week before I start the new one.