Powered By Kitlog Pro v2.0
Garys RV-7 Builders Log
RV-7
All
8-29-2013
< Previous Log Entry
Next Log Entry >
Date:
8-29-2013
Number of Hours:
2.00
Manual Reference:
8-12
Brief Description:
Baggage side cover work.
Tonight, I fit, drilled, and dimpled the F-749 and F-750 baggage side covers. I installed the nut plates on the bottom flanges so the floor will be secured with removeable screws. I also drilled and mounted a tie-down for the forward baggage cover.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
659
880
Airplane and Flying
35
All Things Aviation
35
Avionics
2
Empennage
110
161
Family and Non-Aviat
10
Finishing Kit
2
2
Fuselage
300
530
Miscellaneous
2
Paint Related Items
6
Practice
6
Shop Set Up
18
Tools
19
Wings
114
187
Copyright © 2001-2024 Matronics. All Rights Reserved.